Figure 11-3 toolkit installation path -3 – Clear-Com CellCom Battery Pack Charger User Manual

Page 183

Advertising
background image

Clear-Com Communication Systems

CellCom V2.0.3 Instruction Manual

1 1 - 3

Enter the required information and click on the ‘Next’ button. The
installation requirements screen will be displayed by the installer.

Figure 11-3: Toolkit Installation Path

Either accept the proposed installation path or use the ‘Browse’
function to select a new installation path. Check that there is sufficient
space available to complete the toolkit installation and click on the
‘Next’ button to continue the installation. The toolkit shortcuts setup
screen will be displayed.

Advertising
This manual is related to the following products: