CONTREX MLP-Trim User Manual

Page 63

Advertising
background image

3 - 23

To find Follower Setpoint 1 (CP-03) for Example A:

Follower E.U. desired

15

Setpoint 1

=

________________________________

=

___

=

3

Lead E.U. operation

5

15 gal/min

The Follower Engineering Units (gallon per minute) at which
you want the Follower to operate - do not confuse this with the
full capacity gal/min that the Follower is capable of pumping.

Divided by

5 gal/min

The Lead Engineering Units that the Lead is operating at - do
not confuse this with the full capacity that the Lead is capable
of operating at.

Equals

3.00

Follower Setpoint 1 (CP-03) value.

To find Follower Setpoint 2 (CP-04) for Example A:

Follower E.U. desired

22.5

Setpoint 2

=

________________________________

=

___

=

4.50

Lead E.U. operation

5

22.5 gal/min

The Follower Engineering Units (gallon per minute) at which
you want the Follower to operate - do not confuse this with the
full capacity gal/min that the Follower is capable of pumping.

Divided by

5 gal/min

The Lead Engineering Units (gallon per minute) that the Lead is
operating at - do not confuse this with the full capacity that the
Lead is capable of pumping.

Equals

4.50

Follower Setpoint 2 (CP-04) value.

Advertising