IAI America RCA2-TW4N User Manual

Page 103

Advertising
background image

95

12. Life

(2) Vertical application
The graph below shows the relationship between the cycle time for one back-and-forth operation and the
life of the product in a vertical application (product life: 5 million back-and-forth operations).
The lines based on 8 hours of operation and 24 hours operations a day, for 240 days a year, are shown.
Use this graph as a reference when determining the product life.

Life (years)

8 hours of operation

24 hours of operation

Cycle time (sec)

12.2.1

Relationship of Cycle Time and Product Life

(1) Horizontal application
The graph below shows the relationship between the cycle time for one back-and-forth operation and the
life of the product in a horizontal application (product life: 10 million back-and-forth operations).
The lines based on 8 hours of operation and 24 hours operations a day, for 240 days a year, are shown.
Use this graph as a reference when determining the product life.

Life (years)

8 hours of operation

24 hours of operation

Cycle time (sec)

Advertising