Running a post-processed project, Choosing the survey type/mode and the system setup – Spectra Precision ProMark Field Software User Manual

Page 26

Advertising
background image

English

20

Running a Post-Processed Project

Choosing the

Survey Type/Mode

and the System

Setup

Use the Survey tab on

ProMark Field’s Options

menu for this setting.

Read the table below to choose the survey type and mode and
the system setup suitable for your project.

Reminder: If you are using a base/rover system, remember in
all cases of use, the two receivers should collect raw data at
the same time at their respective locations, using the same
recording interval, and with no interruption allowed.

Your Project

Setup

Survey

Collecting Raw Data on
One Point
:
You want to collect raw data
at the same location
throughout the project. The
receiver is used either as a
base or a rover.

Receiver and antenna
mounted on a tripod:

Post-processing,
Static

Collecting Raw Data on
Several Points
:
You want to go to several
points and perform static
occupations on each of
these points. Raw data will
be collected continuously
throughout the project.

Receiver and antenna
mounted on a pole or bipod:

Post-processing,
Stop-and-go Kine-
matic

Collecting Raw Data along
a Line
:
You want to walk along a
line and let the receiver
automatically log a series of
points along the way. Raw
data will be collected contin-
uously throughout the proj-
ect.

Post-processing,
Continuous kine-
matic

Advertising