Collect control – screen 1, Collect control – screen 2 – Spectra Precision Survey Pro v4.6 Ranger User Manual User Manual

Page 327

Advertising
background image

Basic GPS Module

317

Collect Control – Screen 1

1. Select an existing job file point
2. Designate if it is valid for horizontal,

vertical, or 3D control.

3. Level the receiver over the point and

tap Start Control Point Occupation. This
will open the next Collect Control

screen (Page 317) to monitor the

occupation.


Collect Control – Screen 2

1. Review the choice of H/V control

eligibility.

2. Tap Accept to end the occupation. The

control point is created in the job file

and the raw data is recorded. This

screen and the previous screen will exit,
and you will be at one of two places:

a. If you do not yet have the

minimum amount of control,
you will remain on the

Projection Control Point Status

screen (Page 315).

b. If you now have the minimum amount of control, you

will move forward to the Projection Check Point
Status screen (Page 318).

Advertising