Manage basemaps – Spectra Precision Survey Pro v4.6 Ranger User Manual User Manual

Page 35

Advertising
background image

Getting Started

25

• Before you can use a basemap in

Survey Pro, you need to copy the
appropriate basemap files from a PC to

the same directory where your current

job is located. If the basemap files are
stored in a different directory and then

added to the current job, the files will

be copied to the job’s directory.

• If you use the Save As routine and save

the current job to a new directory, any
basemaps associated with that job will

be copied to the new location.

Manage Basemaps

Once the basemap files are stored on the data collector, they must be
added to the current job before they can be viewed in the map view.
1. To add basemaps, open the Main Map View by tapping the

button in the command bar from the Main Menu.

2. From the main Map View, tap the

button to open the Manage Basemaps
screen shown here.

3. Tap the Add… button. This will open a

new screen where you can select the

basemap that you want to add to the

current job.

4. Once a basemap is added, it will appear in

the list in the Manage Basemaps screen.

5. Repeat Steps 3 and 4 to add any additional

basemaps.

Advertising