GRN4-605

Chapter 5: Maintenance

37 of 93

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

Only trained and specialized personnel should carry out maintenance work.

Maintenance Plan

Danger caused by electrical voltage and starting the machine during

maintenance work. Death can result!

ALWAYS turn main switch to 0, safeguard using a padlock, and attach

a warning sign while carrying out maintenance work.

The tasks for maintenance work are described below.

Perform the following after every 8 operation hours:

Check protective devices.

Check cutting cutter mountings.

Check condition of cutting cutters.

Perform the following after every 40 operation hours:

Check V-belt tension force and V-belt condition.

Check all screws of the machine for a tight fit.

Check wearing parts.

Check hydraulic oil level and consistence.

Per form the following after every 2000 operation hours:

Change hydraulic oil

Check gearbox oil level

Yearly maintenance:

The purpose of yearly maintenance is primarily to check the general condition of
the machine and to arrange for the supply of any necessary replacement parts. A
service engineer can carry out this request.