5.4

General Flue Requirements

5.4.1 Flue terminal clearances

The flue terminal must be sited with minimum

clearance distances as shown in the diagram.


A terminal guard must be fitted if the terminal

is sited less than 2m above ground level, or

above a balcony, or accessible flat roof.

Where the flue terminates within 1m of a
plastic or painted gutter or within 500mm of

painted eaves, then protection should be

provided in the form of an aluminium shield at

least 1m in length, fitted to the underside of
the gutter or painted surface.

Please Note!

Due to the low flue gas temperature,

'pluming' will occur at the flue terminal.

Care should be taken to ensure that the

discharge plume will not cause annoyance
to the customer or neighbours. It is

generally recommended that flues should

discharge vertically at roof level. In this

position, pluming is not normally a
problem.

5.4.2 Flue system

The flue system must be installed in accordance with BS5440:1 and the
Building Regulations. Horizontal flue pipe runs must always be
installed with a minimum slope of 50 mm/metre towards the boiler.

This will prevent condensation from gathering in the flue pipe, and will also

reduce the chance of icicles forming over horizontal pipe ends in the
Winter.