Installation continued – Water Inc HP-RO-1000 User Manual

Page 8

Advertising
background image

9. Installing the Cartridges

the model number.

Cartridge #1 = PW-S2500R, Yellow

Cartridge #2 = PW-C5000R, Blue

Cartridge #3 = PW-RO75R, Green

Cartridge #4 = PW-C2500R, Violet

Install the cartridges in order. If the cartridges are installed

A. Slide the cartridge into the head until it stops.

B. Twist the cartridge 1/4 turn clockwise until it snaps into

place. Gently pull out on the cartridge to ensure the
cartridge is locked into place.

CAPACITY:

Replace every 12 months

TEMPERATURE RANGE:

40-100°F (4.4-37.8°C)

PRESSURE RANGE:

30-125°F (2.4-8.6 Bar)

Quick Change

Sediment Cartridge

For use with Pentair Water models:

PB4RO-75, PP4RO-75 and PB5RO-75

CAPACITY:

Replace every 12 months

TEMPERATURE RANGE:

40-100°F (4.4-37.8°C)

PRESSURE RANGE:

30-125°F (2.4-8.6 Bar)

Quick Change

EP Cartridge

For use with Pentair Water models:

PB4RO-75, PP4RO-75 and PB5RO-75

©

20

10

Pe

nt

ai

r R

es

id

en

tia

l F

ilt

ra

tio

n,

LL

C

M

ilw

au

ke

e,

W

I,

U

S

A

A

ss

em

bl

ed

in

Ch

in

a

SH

24

71

44

Re

v A

M

R1

0

W

arning: Do not use with water that is

microbiologically unsafe or of unknown

quality without adequate disinfection

before or after the systems. Systems

on disinfected waters that may contain

M

ilw

au

ke

e,

W

I,

U

S

A

A

ss

em

bl

ed

in

Ch

in

a

SH

24

71

43

Re

v A

M

R1

0

1

2

3

PW

-C2

500R

on disinfected waters that may contain

PW-S 2500R

PW-C5000R

PW

-C2

500R

Figure 13

10. Connecting the Storage Tank to the System

CAUTION

When tank is full, it weighs approximately 35

pounds. Provide ample support under the tank.

A.

B. Thread the tank valve onto the top of the tank opening

by turning it clockwise until snug.

C. Locate the green tubing and a mark 3/4" from the end.

Moisten one end of the green tubing with water and
insert with a twisting motion into the free port of the tank

NOTE: Do not cut green tube. This line should be left at

the pre-cut length for future service.

NOTE: The pressurized storage tank has capacity of

3.2 gallons. The tank's air pressure is factory
set at 5 to 7 psi when tank is empty.

INSTALLATION continued

11. Putting the System Into Operation

CAUTION

to wall to prevent it from falling and possibly
becoming damaged.

NOTE: Use caution not to bend or pinch the tubing behind

the system while attaching to mounting screws.

may make the water appear gray in color. The

NOTE: The HP-RO-1000 system does not produce a high

does. Water is produced at a slow, drop-by-drop

storage tank. As water is taken from the tank, the
system automatically starts the cycle of replacing
the water and then stops water production when
the tank is full.

A. Make sure cold water faucet is “off” (Figure 14).

B. Make sure tank valve is in the open position.

C. Slowly turn on cold water supply.

D.

for 12 hours, then close it.

E.

check the installation for leaks. After the storage tank

minutes for all of the water to drain from the tank. Close

CAUTION

Visually check the entire system for leaks. If a leak is

present, see TROUBLESHOOTING.

F. Repeat Step E four times.

NOTE: Initially, the water may appear cloudy. This is a

It is not harmful and will disappear in a matter
of minutes. It may take up to a week after

trapped air to dissipate.

The system is ready for operation. You can now enjoy quality
water from the HP-RO-1000.

Open

Tank Valve

Closed

Tank Valve

B

Figure 14

8 • HP-RO-1000 Undersink Reverse Osmosis System

A

NOTE:

Installing the green reverse osmosis cartridge PW-RO75R
requires additional force than the other cartridges to rotate
into the proper position.
Improper installation of the cartridge
may prevent water from flowing through the system.
To ensure proper installation, rotate the cartridge in the port
until the cartridge label faces directly forward and the side tab
on the cartridge aligns with the side port on the filter body.

Advertising