HP Hitachi Dynamic Link Manager Software User Manual

Page 51

Advertising
background image

HiCommand

®

Dynamic Link Manager (HDLM) for Windows

®

Systems User’s Guide

35

Note: If there is a path failure immediately after a path is made offline by using an HDLM
command or HDLM GUI, Offline(C) might change to Offline(E). If an offline operation was
performed, wait for a fixed period of time (about 2 minutes), check the path status by using
an HDLM command or HDLM GUI, and make sure that the status has changed to Offline(C). If
it is Offline(E), retry the offline operation.

Advertising