Installation instructions, Bottom venting (cont.) – GE GFDR480GFWW User Manual

Page 29

Advertising
background image

29

NEVER LEAVE THE BACK OPENING WITHOUT THE

PLATE.

(Kit WE1M454.)

BOTTOM VENTING (cont.)

Connect standard metal elbows and ducts to

complete the exhaust system. Cover back opening

with a plate (Kit WE1M454) available from your

local service provider. Place dryer in final location.

ADDING COVER PLATE TO REAR OF CABINET
(BOTTOM EXHAUST)

Plate

(Kit WE1M454)

Installation Instructions

Through the rear

opening, locate

the tab in the

middle of the

appliance base.

Lift the tab to

about 45° using

a flat-blade

screwdriver.

Reconnect the cut

portion (A) of the

duct to the blower

housing. Make

sure that the

shortened duct is

aligned with the

tab in the base.

Use the screw saved previously to secure the duct

in place through the tab on the appliance base.

Insert the 4” elbow

through the bottom

opening and connect to

the dryer internal duct.

Be sure not to pull or damage the electrical wires

inside the dryer when inserting the duct.

Apply duct tape as

shown on the joint

between the dryer

internal duct and the

elbow, and also the

joint between the

elbow and the bottom

duct.

Internal duct joints must be secured with tape;

otherwise, they may separate and cause a safety

hazard.

Duct tape

ADDING A NEW DUCT

Portion “A”

Fixing hole

Bend tab

up 45°

Advertising