System handover, Checklist – Avaya IP OFFICE 40DHB0002USCL User Manual

Page 50

Advertising
background image

Page 50 - Checklist

System Handover

System Handover

Checklist


Equipment :

– Have all extensions been tested?
– Have all exchange lines been tested?
– Have all private wires been tested?
– Is system programming in line with the customer specification?

E.g. all specified applications, CTI settings, etc.

– Has the customer been made aware of the drop back (power fail) locations?

Are these been clearly marked and have they been tested?

– Has the mains supply (and any UPS if fitted) been tested?

Wiring :

– Have the trunk modules and Analog Trunk 16, where equipped, been fitted with the appropriate

functional/protective grounds (see page 37).

– Is the distribution wiring (structured cabling) satisfactory to the required national standards?
– Are all wires and cables clearly labeled.
– Is the site clean and tidy with all rubbish removed?

Information :

– Have the telephone user guides been issued to the user.
– Has the customer been made aware of the telephone number for maintenance/fault reports.

Feature Key :

– Where a Feature Key has been used (for software requiring a license), record it's physical

location (location of the PC is it plugged into) and leave a record of such on site with the system.


Page 50 - System Handover

IP Office Installation Manual

Checklist

40DHB0002USCL – Issue 7 (09/25/2002)

Advertising