Aiphone 83873900 0602 E User Manual

Page 18

Advertising
background image

To: NHX-50M

To: NHR-SP

Cable

5P

6 parallel conductors

Distance

65' w/22AWG

65' w/22AWG

(20m w/0.65mmø)

(20m w/0.65mmø)

– 18 –

*

When Duty station (NHR-SP) is installed, remove the shorting

connector from CN104 socket . Line-off trouble will be activated at the

y

(

)

g

y

(

)

NHX-50M when wires to NHR-SP are broken.

* The Shorting connector is kept in the CCU, attached to internal wires.

It is necessary only when wires to NHR-SP are broken.

g

p

g

p

To silence the tone, plug in the shorting connector until NHR-SP is

y

y

y

y

restored to normal operation.

p g

p g

WIRING DIAGRAMS

1. NHX-80X CCU to NHX-50M, NHX-30G & Duty station

Wiring on NHX-80X CCU

* Use UL Listed cable for all wiring.

Duty station

NHR-SP

Master

NHX-50M

Add-on

NHX-30G

NHX-80X

10(5P)

6

M3

M4

M2

S5

S6

S3

S4

S1

S2

S5

S6

S3

S4

S1

S2

M5

M6
M7
M8

M3

M4

M1

M2

M5

M6

M9

M10

M9

M6

M7
M8

CN104

NHX-80X

NHX-50M

NHX-30G

M1

Each polarized pairs

Connectors (2)

Removed

6(parallel)

Duty station

NHR-SP

Advertising