Assemble the power end to the pedestal – Goulds Pumps XHD - IOM User Manual

Page 91

Advertising
background image

Maintenance

14. Lubricate the outboard bearing cover o-ring (412) and insert into the outboard bearing

cover (109).

15. Slide the outboard bearing cover (with Inpro seal and o-ring attached) into the bearing

cartridge housing (228) carefully to avoid o-ring damage.

16. Hand tighten the outboard bearing cover assembly to the bearing cartridge housing (228)

using the hex head cap screws (370N) until the shaft becomes difficult to rotate by hand.

17. Measure gap between face of bearing end cover (109) and the face of the frame with

feeler gages.

18. Select and measure shim pack such that the thickness of the shims are equal to the gap

measured in (17) above plus 0.020" added shim.

19. Remove the end cover (109) and add the shim pack (390C) noted above to the assembly.
20. Secure the outboard bearing cover assembly to the bearing cartridge housing (228) using

the hex head cap screws (370N).

21. Insert the shaft key (400) into the keyway in the outboard end of the shaft (122).
22. Install the bulls eye sight glass (319) and plug, opposite (408N) into the bearing cartridge

housing (228) if removed previously.

23. Insert the oil drain plugs (408A) and the oil fill pipe plug (319B) into the bearing cartridge

housing (228).

Assemble the power end to the pedestal

1. Apply anti-seizing compound to the pedestal (131) rails that support the power end.
2. Attach the hoist hook to the bearing cartridge housing (228) lifting lug.

XHD Installation, Operation, and Maintenance Manual

89

Advertising