Do not use copper tubing or existing copper condensate

lines for drain line.

CAUTION

Condensate line must slope downward away from the trap

to drain. If drain level is above condensate trap, condensate

pump must be used. Condensate drain line should be routed

within the conditioned space to avoid freezing of condensate

and blockage of drain line. If this is not possible, a heat

cable kit may be used on the condensate trap and line.

Heating cable kit is available in various lengths; 6 ft. (1.8 m)

- kit no. 26K68; 24 ft. (7.3 m) - kit no. 26K69; and 50 ft. (15.2

m) - kit no. 26K70.

CONDENSATE TRAP LOCATIONS

(Unit shown in horizontal right hand discharge position

)

Figure 43

*Piping from furnace must slope down a minimum

of 1/4” per ft. toward trap.

Figure 44

CONDENSATE ASSEMBLY

Figure 45

UNIT WITH EVAPORATOR COIL

Figure 42

CONDENSATE TRAP LOCATIONS

(Unit shown in upflow position with remote trap)

*Piping from furnace must slope down

a minimum of 1/4” per ft. toward trap.