Installation procedure, Parts list, Product overview – Muxlab Passive CCTV/GLI Hub User Manual

Page 6

Advertising
background image

© MuxLab Inc.

Passive CCTV/GLI Hub Installation Guide

Page 6

3.

Installation Procedure

3.1.

Parts List

The Passive CCTV/GLI Hub comes with the following
parts. Please verify that all pieces are present before
proceeding.

Base Unit (Factory configuration: Power-Thru Mode

(500022)

Installation Guide

3.2.

Product Overview

The external connections of the Passive CCTV/GLI Hub
are detailed in the following diagrams. Please
familiarize yourself with them before installing the unit.

Figure 1: Front panel

Figure 2: Rear panel

Advertising