Bryant 395CAV User Manual
Page 19
Advertising
CHECKLIST—INSTALLATION
LOAD CALCULATION
CHECKLIST—START-UP
________
Heating Load (Btuh)
Gas Input Rate
(Set Within 2 Percent of Rating
Plate)
________
________
Cooling Load (Btuh)
________
Temperature Rise Adjusted
________
Furnace Model Selection
Thermostat Anticipator Setting
Adjusted or
________
AIR FOR COMBUSTION AND VENTILATION
________
Unconfined Space
Thermostat Cycle Rate (3 cycles per
Hr)
________
________
Confined Space
CHECK SAFETY CONTROLS OPERATION
VENTING
________
Primary Limit
________
NFGC (United States)
________
Pressure Switches
________
NSCNGPIC (Canada)
________
Draft Safeguard Switch
________
Local Codes
________
1/4-in. Upward Slope
________
Joints Secure
________
See Attached Vent Table Instructions
—19—
Advertising