Bryant 395CAV User Manual

Page 19

Advertising
background image

CHECKLIST—INSTALLATION

LOAD CALCULATION

CHECKLIST—START-UP

________

Heating Load (Btuh)

Gas Input Rate
(Set Within 2 Percent of Rating
Plate)

________

________

Cooling Load (Btuh)

________

Temperature Rise Adjusted

________

Furnace Model Selection

Thermostat Anticipator Setting
Adjusted or

________

AIR FOR COMBUSTION AND VENTILATION

________

Unconfined Space

Thermostat Cycle Rate (3 cycles per
Hr)

________

________

Confined Space

CHECK SAFETY CONTROLS OPERATION

VENTING

________

Primary Limit

________

NFGC (United States)

________

Pressure Switches

________

NSCNGPIC (Canada)

________

Draft Safeguard Switch

________

Local Codes

________

1/4-in. Upward Slope

________

Joints Secure

________

See Attached Vent Table Instructions

—19—

Advertising