Load configuration, Run configuration, Load configuration run configuration – Kinze Ag Leader Integra User Manual

Page 297: Onfiguration

Advertising
background image

281

A

PPLICATION

S

PREADER

2. Enter a Base Amount of product and the controlling Units for the dry product blend. Press

to

continue.

Note: The Base Amount is the total weight of product for the fertilizer blend. The Base Amount does not need
to match the actual volume of product that will be applied, but is used only to establish the ratio of all products
to the total volume.

3. Press

to start the process of adding components to the fertilizer blend.

Note: Any liquid herbicides set up within the system can be added to create an impregnated blend product.

4. Select the desired component from the list box. New components can be set up at this time if required.

5. Enter the amount of the first component.

6. Press

to start adding an additional component. (A dry mix can contain up to seven individual

components.)

7. The remaining Base Amount that is available after adding product components is shown at the bottom
of the on-screen list box.

8. Enter Manufacturer name if applicable. Press

to enter a unique name for the blend.

9. Press

to complete the process of setting up the dry blend. The new Dry Blend now appears in

the Product List.

The Operating Configuration is now able to be selected when starting a new Field Operation with the
Field Operation Wizard.

L

OAD

C

ONFIGURATION

Press: Select Event button.

Select a Season, Grower, Farm, and
Field on the Management Selection

screen.

For more information, see

“Setup Event” on page

49

.

R

UN

C

ONFIGURATION

Once a configuration has been completed, the Map View button appears at the bottom of the
Home screen. Press the Map View button to see the Map screen. The map below is displayed
in Zoom to Extent view.

Below is an example of a Spinner Spreader Granular Product Control applying two products.

Select Event

Advertising