Update of a project from V2.x to V3.x

Import of the example project into the »PLC Designer« V3.x

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Convert libraries

The libraries used in the »PLC Designer« V2 project have to be replaced manually by the

suitable libraries in the »PLC Designer« V3.
The following libraries have to be converted, for example (V2  V3):

• Standard (V2)  Standard (V3)
• IecSfc (V2)  IecSfc (V3)
• All system libraries: SysLibxxx (V2)  SysLibxxx23 (V3)

Example: Replace SyslibPlcCtrl (V2) by SysPlcCtrl23 (V3)

Exceptions:

• A conversion of the 3S_CAN libraries is not required.  Click "Ignore library".

After inserting a CAN bus into the project, the suitable libraries are inserted

automatically.

• A conversion of the Analyzation library is not possible in the »PLC Designer« V3. Thus,

these function cannot be used in the »PLC Designer« V3.

• All Motion libraries (examples: SM_DriveBasic, SM_PLCOpen, DummyDrive, SM_CNC,

SM_Trafo, SM_Error) have to be ignored.  Click "Ignore library".

When a Motion target system is inserted into the project, the required Motion libraries

are automatically available due to SM3_Basic and SM3_CNC.

Example: Convert the reference to the SysLibCallback.lib library to V3:

• Version 2-compatible system libraries are located on the V3 system in the \SysLibs23

directory.

Advertising