Update of a project from v2.x to v3.x – Lenze PLC Designer Migration PLC Designer (R2-x)-PLC Designer (R3-x) User Manual

Page 24

Advertising
background image

Update of a project from V2.x to V3.x

Import of the example project into the »PLC Designer« V3.x

24

Lenze · PLC Designer | Migration of V2.x projects · 1.2 EN - 02/2013

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The following CAN device configuration arises in the example project:

The following components have been

automatically imported and updated in this

sample project:

• Cams
• CNC programs
• Program blocks
• »PLC Designer« - internal visualisation
• Task configuration

After the device configuration has been

created, the example project has been

completely converted from V2 to V3 and can

be executed.

Advertising