Update of a project from V2.x to V3.x

Import of the example project into the »PLC Designer« V3.x

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

7.2

Import of the example project into the »PLC Designer« V3.x

How to import a V2 project into the »PLC Designer« V3.x:

1. Start»PLC Designer« V3.x.
2. Open the »PLC Designer« V2 project (FileOpen project):

• Select file extension *.pro (CoDeSys projects (before V3.0).

3. Convert devices

• Replace the target system set in the V2 project by a corresponding V3 target system.

Note: You have the option to save the assignment for future projects: Activate the control

field  to replace the target system automatically by this V2 target system during the next

project import.