MTS Criterion Series 40 User Manual

Page 102

Advertising
background image

4. Click OK when complete. Maximum and Minimum appear in the statistical results panel.

8. Add and configure views.

You can show up to four views at a time. You can also add additional views and switch to them as
desired.

a) Switch to four-panel view by clicking the Four Panel View button in the toolbar.

b) Add and configure a view to show load vs. extension in inches and pounds force.

1. Right-click the lower right panel. Select Views > Add View > Array-Variable Marker Chart for

Multiple Runs.

102 | MTS Criterion

Series 40

Reviewing, Analyzing, and Reporting Data

Advertising