Installation, Unit assembly prior to installation, Venting introduction – Regency Panorama P33E Small Gas Fireplace User Manual

Page 16

Advertising
background image

16

Regency® P33E-4 Zero Clearance Direct Vent Gas Fireplace

INSTALLATION

The Top Facing Support, the Side Nailing Strips and
the 2 Top Standoffs must be correctly positioned and
attached to the top before the unit is put into position.

Top Standoff Assembly

The top standoffs are shipped in a fl at position and
must be pulled up and bent into the correct shape.

1) Remove the standoffs from on top of the fi rebox

by undoing the screws.

2) Take each standoff and bend into the correct

shape. Bend up at the bend lines until the screw
holes in the standoff and the pre-punched screw
holes on the fi rebox top line-up.

3) Attach the standoffs securely to the top with 4

screws per standoff.

Note: Secure the standoffs to the holes closest
to the edge of the fi rebox top.

Top Facing Support &

Side Nailing Strips

Determine the total thickness of facing material
(e.g. drywall plus ceramic tiles) to allow the fi nished
surface to be fl ush with the front of the unit. Total
facing thickness can vary from 1/2" (13mm) to
1-1/4" (32mm) thick.

The Top Facing Support & Side Nailing Strips can
be mounted in various positions depending on the
thickness of the facing material.

1) Mount Top Facing Support using the 3 supplied

screws into the three pre-punched screw holes
on the top front of the unit. Adjust support to
desired facing material depth.

2) Mount Side Nailing Strip using the 3 supplied

screws into the three pre-punched screw holes
at the front sides of the unit. Adjust support to
desired facing material thickness.

UNIT ASSEMBLY PRIOR TO INSTALLATION

Top Facing

Support

Side

Nailing

Strips

(folded out)

VENTING INTRODUCTION

The P33E-4 uses the "balanced fl ue" technology Co-Axial system. The inner liner vents products of combustion to the outside while the outer liner
draws outside combustion air into the combustion chamber thereby eliminating the need to use heated room air for combustion and losing warm room
air up the chimney.

There are 5 vent systems approved for use with the P33E-4: the Regency

®

Direct Vent Flex System for Horizontal Terminations only and the Simpson

Dura-Vent Pro, Selkirk Direct-Temp, Amerivent Direct Vent, Metal-Fab Sure Seal, Security Secure Vent and ICC Excel Direct for Horizontal and Vertical
Terminations (see following "Venting" Sections for more details).

Note: These

fl ue pipes must not be connected to any other appliance.

The gas appliance and vent system must be vented directly to the outside of the building, and never be attached to a chimney serving a separate solid
fuel or gas burning appliance. Each direct vent gas appliance must use it's own separate vent system. Common vent systems are prohibited. (See "Rigid
Pipe Venting System" for more details and exceptions).

NOTE: Ensure compliance with the outside vent terminal location before cutting hole as both dimensions must be met.

For a facing material depth of
1-1/4"(32mm), the top facing
support must be reversed.

Advertising