Installation, Unit assembly prior to installation, Venting introduction – Regency Panorama P36E Medium Gas Fireplace User Manual

Page 18

Advertising
background image

P36E-4 Zero Clearance Direct Vent Gas Fireplace

18

INSTALLATION

Side

Nailing Strips

"C" Screw Position:
For a facing material depth of 1-1/4" (32mm),
the top facing support must be reversed.

UNIT ASSEMBLY

PRIOR TO

INSTALLATION

The Top Facing Support, the Side Nailing Strips
and the 2 Top Standoffs must be correctly
positioned and attached to the top before unit
is slipped into position.

Top Standoff Assembly

The top standoffs are shipped in a fl at position
and must be folded into shape and attached.

1) Remove the standoffs from the fi replace top.

2) Take each standoff and bend into the correct

shape. Bend up at the bend lines until the
screw holes in the standoff and the pre-
punched screw holes on the fi replace top
line up.

3) Attach the standoff securely to the top with

2 screws per standoff (on opposite corners).

VENTING

INTRODUCTION

The P36E uses the "balanced fl ue" technology
Co-Axial system. The inner liner vents products
of combustion to the outside while the outer
liner draws outside combustion air into the
combustion chamber thereby eliminating the
need to use heated room air for combustion and
losing warm room air up the chimney.

Note:

These flue pipes must not be

connected to any other appliance.

The gas appliance and vent system must be
vented directly to the outside of the building,
and never be attached to a chimney serving a
separate solid fuel or gas burning appliance.
Each direct vent gas appliance must use it's own
separate vent system. Common vent systems
are prohibited.

Top Facing Support &

Side Nailing Strips

Determine the total thickness of facing material
(e.g. drywall plus ceramic tiles) to allow the
fi nished surface to be fl ush with the front of the
unit. Total facing thickness can vary from 1/2"
(13mm) to 1-1/4" (32mm) thick.

The Top Facing Support can be mounted in 3
different positions depending on the thickness
of the facing material.

2) Fold out the two nailing strips on each side.


1) Mount Top Facing Support using the 3

supplied screws into the three pre-punched
screw holes on the top front of the unit. Use
hole positions A, B, or C depending on your
facing depth.

Screw

Position

Facing Material

Depth

A

1/2" / 13mm

B

7/8" / 22mm

C*

1-1/4" / 32mm

* For "C" screw position the top facing
support is reversed.

Advertising