Battery wiring and installation (cont.) – Rockwell Automation 1609-B_D UPS Product User Manual User Manual
Page 12
Advertising
12
Rockwell Automation Publication 1609-UM009A-EN-P - January 2013
Bulletin 1609 UPS
Battery Wiring
and Installation (cont.)
4. To connect the batteries to the UPS, insert the batteries into the battery
compartment, open the white connector retainer and connect the two
cables together as shown in the photo below.
5. To complete the battery installation, close the white connector retainer
and reattach the battery door with the three screws (torque of 8.7+/-1.7 lb-in).
Advertising