Its (download), Dht (handheld programming terminal), Startup checklist – Rockwell Automation 1395 Reel Tension Paster Adapter User Manual

Page 23

Advertising
background image

Publication 1395-RTP-5.1 - September 1997

Start-Up Instructions

3-3

ITS (Download)

To download from ITS to Drive:

From Main Menu,

Select “Drive Data”,

Select “Edit” ENTER key,

Select “Parameter”, (cursor through Parameters), make changes,
ESC,

Select “EEPROM”, ENTER key,

Select “Save”, ENTER key

DHT (Hand-Held Programming Terminal)

From Main Menu,

Select “Parameters”,

Type Parameter number, ENTER key,

Arrow-down cursor to value and type new value, ENTER key,

When changes are completed, depress “MENU” key,

The DHT will prompt “SAVE CHANGES”?

Select “Yes”, ENTER key

Start-Up Checklist

Verify J6 and J7 jumpers on the Digital Reference Adapter Board are
in Position 1-2.

Verify J1 jumper on Feedback section of the PSI/Switcher Board of
the 1395 Drive is in Position 3.

Verify J8, J9, and J10 jumpers on the Main Control Board of the 1395
Drive to be in Position 1-2 (Figure 3-1).

Verify burden resistors on Feedback Board to be 25.2 Ohms on TB1
and 80 Ohms on TB3, for a 1395-B68, or, 13.8 Ohms on TB1 and
45.9 Ohms on TB3 for a 1395-B70.

Verify incoming AC line to Drive, L1, L2, and L3, to 380 or 460
VAC, ± 10%.

Advertising