Dual trunk e1 router – Black Box LRU4240 User Manual

Page 103

Advertising
background image

Dual Trunk E1 Router

Dual Trunk E1 Router User’s Guide

TECHNICAL: 0118 96 56 000

91

The

NET

LED does not

illuminate.

• No incoming signal.

• Bad LED.

• Run a lamp test from Menu-9,

Diagnostics to make sure the LEDs
are working.

• Make sure the E1 line from your

service provider is connected to the
RJ-48C female connector on the
back of the LRU4240 NTU.

• Remove the E1 line from the back

of the LRU4240 and place the E1
test set in its place. Connect the
transmit of the E1 test set to the
receive of the network plug (pins 3
and 11, 3—tip, 11—ring). If the

NET

LED changes to any color,

i.e., green or red, contact your
service provider for assistance with
cutting over the E1 line.

• Place the E1 loopback plug on the

network connector on the back of
the LRU4240. If it then changes
color, troubleshoot your test setup.

• If the

NET

LED never lights, call

Black Box Technical Support for
assistance.

The

NET

LED is constantly red.

• Constant out-of-sync or out-of-

frame on E1.

• Misframe/FE.

• Carrier has problem.

• Configuration doesn’t match

framing.

• Make sure the E1 line framing

format matches the LRU4240’s
framing format.

• Check the LRU4240 for excessive

errors.

• In CRC4-Enabled mode, check for

CRC and CV; in CRC4-Disabled
mode, check for CVs only. If
excessive errors appear, place your
E1 test set or your loopback plug
on the RJ-48C or BNC socket on the
back of the system to see if the
errors stop.

• If they do, contact your service

provider for assistance.

• If the errors do not stop, call Black

Box Technical Support for
assistance.

Table 11-2 Network Problems (2 of 4)

Symptom

Probable Cause

Solution

Advertising