Preventive Maintenance Schedule

Table 1:

Recommended Schedule for Preventive Maintenance

Preventive Maintenance Task

Interval

Review status LEDs

Daily

Check fuses

3 months

Check wiring terminals

3 months

Check seating of plug-in components

3 months

Check for contamination, general condition and

adequate environmental protection

3 months

Check ground connection

3 months

Check analogue input module calibration

2 years

Check digital input module calibration

3 years

Check analogue output module calibration

2 years

Perform manual test

Manual Test Interval

Note: Testing of the logic solver and its associated field devices must be carried out according to the
appropriate plant or process safety analysis and the safety integrity validation. The manual test interval
is used by the Probability of Failure on Demand (PFD) data analysis as part of the certification process.
Refer to the document "PFH and PFD Data for AADvance Controllers" - Doc No: 553847.

Check Fuses

To check the controller fuses do the following: