Bryant PURON 581J User Manual

Page 37

Advertising
background image

37

C09302

Fig. 61 -- EconoMi$er IV Wiring

Step 13 — Adjust Factory--Installed Options

Smoke Detectors —
Smoke detector(s) will be connected at the Controls

Connections Board, at terminals marked “Smoke

Shutdown”. Cut jumper JMP 3 when ready to energize

unit.
EconoMi$er IV Occupancy Switch —
Refer to Fig. 61 for general EconoMi$er IV wiring.

External occupancy control is managed through a

connection on the Controls Connections Board.
If external occupancy control is desired, connect a time

clock or remotely controlled switch (closed for Occupied,

open for Unoccupied sequence) at terminals marked

OCCUPANCY. Cut jumper JMP 2 to complete the

installation.

Step 14 — Install Accessories

Available accessories include:

Curb
Thru--base connection kit (must be installed before unit

is set on curb)
LP conversion kit

Manual outside air damper
Two--Position motorized outside air damper
EconoMi$er IV (with control)
EconoMi$er2 (without control/for external signal)
Barometric relief
Power Exhaust
Differential dry--bulb sensor (EconoMi$er IV)
Outdoor enthalpy sensor
Differential enthalpy sensor
CO

2

sensor

Smoke detector (Return Air and/or Supply Air)
DDC interface (PremierLink)
Louvered hail guard
Hood--type hail guard
Phase monitor control

Refer to separate installation instructions for information

on installing these accessories.

Pre--Start and Start--Up

This completes the mechanical installation of the unit.

Refer to the unit’s Service Manual for detailed Pre--Start

and Start--Up instructions.

581J

Advertising