Bendix Commercial Vehicle Systems AD-SP SYSTEM PURGE AIR DRYER 10/04 User Manual

Page 13

Advertising
background image

13

Disassembly of the desiccant cartridge assembly

should not be attempted! Detail parts for the cartridge

are not available and the cartridge contains a 150#

spring which can not be mechanically caged.

2. Remove both o-rings (12 & 13) from the desiccant

cartridge bolt.

3.

Remove the retaining ring (14) that secures the purge

valve assembly (15) in the end cover (6).

4.

Vertical check valve models: Remove the retaining

ring (30) that secures the delivery check valve

assembly in the end cover (6). Remove and separate

the perforated plate (26), spring (27), check valve body

(28) and o-ring (29).

5.

Horizontal check valve models: Remove delivery

check valve plug (23) that secures the check valve

assembly in the end cover (6). Remove the spring

(24), check valve (25) and o-ring (2).

6. Remove the retaining ring (20) that secures the heater

and thermostat assembly (21) in the end cover (6).

Gently pull the heater and thermostat (21) out of the

end cover (6) and remove the o-ring (19).

7. Using a 9/16” wrench, remove the safety valve

assembly (22) from the end cover (6).

CLEANING & INSPECTION

1. Using mineral spirits or an equivalent solvent, clean

and thoroughly dry all metal parts except the desiccant

cartridge.

2. Inspect the interior and exterior of all metal parts that

will be reused for severe corrosion, pitting and cracks.

Superficial corrosion and/or pitting on the exterior

portion of the end cover is acceptable.

3. Inspect the bores of both the end cover and the purge

valve housing for deep scuffing or gouges.

4. Make certain that all purge valve housing and end cover

passages are open and free of obstructions.

5. Inspect the pipe threads in the end cover. Make certain

they are clean and free of thread sealant.

6. Make certain that the purge orifice in the cartridge bolt

is open and free of obstructions.

7. Inspect all air line fittings for corrosion. Clean all old

thread sealant from the pipe threads.

8. All o-rings removed should be discarded and replaced

with new o-rings provided in appropriate kit(s).

ASSEMBLY

For purge valve assembly instructions refer to the

instruction sheet included in the kit. A listing of maintenance

kits is included in this document.
1. Complete the purge valve installation per the installation

instructions provided in the service kit.

2. Using a 9/16” wrench, install the safety valve assembly

(22) into the end cover (6).

3.

Vertical check valve models: See Figure 9. Install

the o-ring (29) on the check valve body (28) and push

the o-ring down, over the 3 guide lands until it is in the

o-ring groove of the check valve body (28). Install the

check valve spring (27) on the check valve body so that

the

small coils of the spring slip over the check valve

body. Install the assembled check valve body, o-ring,

and spring (27, 28 & 29) in the end cover (6) so that

the o-ring rests on its seat in the end cover (6) and the

spring is visible. Install the perforated plate (26), in the

end cover (6) and secure the check valve assembly

using the retaining ring (30). Make certain the retaining

ring is fully seated in its groove in the end cover (6).

4.

Horizontal check valve models: Install o-ring (2) onto

check valve (25). Place the check valve in the delivery

check valve port of the end cover (6). Install the spring

(24) over the delivery check valve (36) and secure with

the delivery check valve plug (23).

5. Install the o-ring (19) on the heater and thermostat

assembly (21). After making certain the sponge rubber

cushion is positioned between the connector body and

thermostat, gently push the heater and thermostat

assembly (21) into the end cover (6), making certain

the heating element enters the small diameter bore in

the larger heater and thermostat bore in the end cover

(6). Secure the heater and thermostat assembly in the

body using the retaining ring (20). Make certain the

retaining ring is fully seated in its groove in the end

cover (6).

6. Lubricate the o-rings (12 & 13) and install them on

the desiccant cartridge bolt (10) and using a twisting

motion, insert the assembled desiccant cartridge bolt

in the end cover (6).

7. Install the desiccant cartridge (11) on the end cover

(6) making certain the cartridge is properly seated and

flush on the end cover.

Note: It may be necessary to rotate the cartridge slightly

until the anti-rotation lugs are properly aligned and allow

the cartridge to rest flush against the end cover.

Advertising
This manual is related to the following products: