Bendix Commercial Vehicle Systems AD-SP SYSTEM PURGE AIR DRYER 10/04 User Manual

Page 17

Advertising
background image

17

3. The wire harness—available in the Wire Harness and

Splice Kit from authorized Bendix

®

parts outlets —is not

included with the service replacement air dryer. When

using this kit, if it becomes necessary to lengthen the

harness, use only 14 gauge wire. When splicing wires,

ensure all wire splices are waterproofed.

4. Tie wrap or support all electrical wires leading to the

Bendix

®

AD-IP

®

air dryer at 6–8 inch intervals.

Note: Wires should have sufficient slack and not be

completely taught.

TESTING THE BENDIX

®

AD-IP

®

AIR DRYER

Before placing the vehicle in service, perform the following

tests.
1. Close all reservoir drain cocks.
2. Build up system pressure to governor cut-out and note

that the air dryer purges with an audible escape of air.

3. “Fan” the service brakes to reduce system air pressure

to governor cut-in. Note that the system once again

builds to full pressure and is followed by a purge at the

AD-IP air dryer exhaust.

4. It is recommended that the following items be tested

for leakage to ensure that the AD-IP air dryer will not

cycle excessively.
(A) Total air system leakage (See Bendix publication

BW5057 “Air Brake Handbook.”)

(B) Compressor unloader mechanism.
(C) Governor.
(D) Drain cock and safety valve in first (supply)

reservoir.

(E) All air connections leading to and from the first

(supply) reservoir.

(F) Delivery check valve.

Advertising
This manual is related to the following products: