Power installation – Brew Express BE-110 INSTALLATION User Manual

Page 12

Advertising
background image

Always turn off power supply at main electrical panel before attempting any electrical installation. Local electrical
codes vary. All electrical installation must be done in accordance with local codes. Installation must be performed
by a qualified electrician, or equivalent.

IMPORTANT:
Installation must be performed by a qualified electrician, or equivalent.

The BREW EXPRESS can be installed in most places where power and water are supplied.
See diagrams below for the application best suited for your needs.

OPTION A. (New Construction)

Power can be brought to rough-in-box by
adding a new line from main breaker panel.
Contact a qualified electrician for this application.
NOTE: When routing electrical power to desired
location it is recommended that you allow an additional
18” length of wire at the rough-in-box location.

OPTION B. (New or Existing Construction)

Power to rough-in-box can be tapped from an
existing adjacent electrical outlet. NOTE: When routing
electrical power to desired location it is recommended
that you allow an additional 18” length of wire at the
rough-in-box location.

OPTION C. (Existing Construction)

Electrical outlet can be removed and replaced with the
rough-in-box. NOTE: When routing electrical power to
desired location it is recommended that you allow an
additional 18” length of wire at the rough-in-box location.

9

pOwEr INSTALLATION

OPTION A

OPTION B

OPTION C

Advertising
This manual is related to the following products: