Brewer installation – Brew Express BE-110 INSTALLATION User Manual

Page 13

Advertising
background image

10

BrEwEr INSTALLATION

IMPORTANT:
If installing unit PRIOR to cabinets, it is strongly advised to consult with cabinet maker and build-
ing contractor for exact height of counter top due to the various thicknesses of counter tops (tile
laminate, granite, etc). For best results cut hole and install unit AFTER cabinets are installed.

A. Installing BREW EXPRESS on Counter

It is best to install the unit so the bottom edge is just above the

counter top. In an existing home, this may require part of the

back splash to be removed. Use template provided to

determine the location to be cut out for rough-in-box.

B. Installing BREW EXPRESS with Full Back Splash

Use template provided to determine the location to be cut

out for rough-in-box. Ensure fit is correct by first placing

rough-in-box in cut out hole. Remove rough-in-box. Finish
installation of full height back splash to cut opening. If full
height back splash is granite or tile, it is recommended to
cut opening and install rough-in-box after surface is complete.


IMPORTANT: DO NOT COMPLETE INSTALLATION OF

ROUGH-IN-BOX BEFORE BACK SPLASH.

C. Installing BREW EXPRESS above Back Splash

If you prefer a continuous back splash, the unit can be installed

above the back splash. Use template provided to find best fit.

IMPORTANT: WHEN INSTALLING THE UNIT ABOVE BACK

SPLASH, BE CERTAIN THERE IS SUFFICIENT ROOM BELOW

THE CABINETS.

Advertising
This manual is related to the following products: