Brewer installation – Brew Express BE-110 INSTALLATION User Manual

Page 14

Advertising
background image

Installation of Rough-In-Box

1. Locate wall studs adjacent to the desired location.

Place template on wall as shown. Outside edge of slots

in template should be even with left or right side of stud

edge. The slots in the template designate the area to be cut.

Outside edge of template is equivalent to brewer size .

See figure 1.

2. Use a utility knife to carefully cut inside the penciled

outline area. Start with the stud side and work outward.

DO NOT USE A SAW. Remove sheet rock section to expose

wall cavity. Bring water and power supply lines from source

to this location. Allow 18” of slack. See Figure 2.

3. IMPORTANT Completely seal all gaps between counter

and wall with silicone caulk. This prevents water from

going behind the cabinet if there is a water leak.

Figure 3

Figure 1

BrEwEr INSTALLATION

CUTOUT

(allow 18” of slack)

Caulk gap

Figure 2

11

Advertising
This manual is related to the following products: