Brewer installation – Brew Express BE-110 INSTALLATION User Manual

Page 16

Advertising
background image

13

BrEwEr INSTALLATION

6. After sheet rock screws are in place, bend tabs to finish securing

rough-in box to wall. See figures 6 and 7. Use pliers (if needed)

to bend/crimp tabs firmly to wall. Gently slide excess water

line back through grommet into wall cavity leaving top of

connector a maximum of 3” above bottom of rough-in box.

Carefully install power panel cover. All electrical wires and

connections MUST be tucked completely inside

POWER PANEL COVER, without exposing bare wiring inside

rough-in box. It is advised you contact a qualified electrician.

Be certain not to damage wires or insulation. See Figure 7



Installation of Brewer

7. Important, for the BE-104C model (single button), set 2/4 cup volume
selection switch on back of brewer prior to installation of brewer.

3" max

Power Panel

Figure 6

Figure 7

Advertising
This manual is related to the following products: