2.1 Setting up the instrument

752 Pump Unit

7

2

Installation

2.1

Setting up the instrument

2.1.1

Packaging

The 752 Pump Unit is supplied together with the separately packed

accessories in special packagings containing shock-absorbing foam

linings designed to provide excellent protection. The actual instrument

is packed in an evacuated polyethylene bag to prevent the ingress of

dust. Please store all these special packagings as only they can assure

damage-free transport of the instrument.

2.1.2

Check

After receipt, immediately check whether the shipment is complete and

has arrived without damage (compare with delivery note and list of

accessories in section 5.2). In the case of transport damage, see

instructions in section 5.4.1 "Warranty".

2.1.3

Location

Position the instruments in the laboratory at a location convenient for

operation, free from vibrations and protected against a corrosive

atmosphere and contamination by chemicals.

2.1.4

Arrangement of the instruments

In one-channel operation with suppressor module (2.733.0X30 IC

Separation Center), the 752 Pump Unit, 709 IC Pump, 733 IC Separa-

tion Center and 732 IC Detector are best stacked on top of one another

in this order.

The 752 Pump Unit should always be placed at the bottom of the

instrument stack so that any leaks which may occur in the pump

tubing or connections cannot cause damage to the other instruments

by leakage of corrosive liquids (e.g. H