2 mains connection, 1 setting the mains voltage – Metrohm 752 Pump Unit User Manual

Page 11

Advertising
background image

2 Installation

752 Pump Unit

8

2.2

Mains connection

Follow the instructions below for connecting to the power supply. If

the instrument is operated with the mains voltage set wrongly and/or

wrong mains fuse there is a danger of fire!

2.2.1

Setting the mains voltage

Before switching on the 752 Pump Unit for the first time, check that the

mains voltage set on the instrument (see Fig. 3) matches the local

mains voltage. If this is not the case, you must reset the mains voltage

on the instrument as follows:

1 Disconnect mains cable

Disconnect mains cable from mains connection plug 15

15 of the

752 Pump Unit.

2 Remove fuse holder

Using a screwdriver, loosen fuse holder 10

10 and take out com-

pletely.

3 Change mains voltage

Completely remove voltage selection insert 11

11 by hand, rotate it

through 180° and reinsert it. The required mains voltage (115 or

230 V) must now be visible from the front.

4 Check fuses

Carefully take both fuses out of fuse holder 10

10 and check their

specifications:

100

…120 V 0.2 A (slow-blow) Metrohm-No. U.600.0009

220

…240 V 0.1 A (slow-blow) Metrohm-No. U.600.0006

5 Insert fuses

Change both fuses if necessary and reinsert in fuse holder 10

10.

6 Install fuse holder

Push fuse holder 10

10 back into the opening of 752 Pump Unit by

hand until it clicks into place properly.

Advertising