Figure 20, Deaerating the high pressure pump – Metrohm 850 Professional IC MSM-HC MCS Prep 3 User Manual
Page 51
■■■■■■■■■■■■■■■■■■■■■■
3 Installation
850 Professional IC Anion – MSM-HC – MCS – Prep 3
■■■■■■■■
41
Deaerating the high pressure pump
The instrument must be connected to the PC and switched on to deaerate
the high pressure pump.
5
1
2
6
7
5
3
4
5
Figure 20
Deaerating the high pressure pump
1
Syringe 10 mL 6.2816.020
For aspirating the eluent.
2
Luer connector
On purging needle.
3
Purging needle 6.2816.040
4
Deaerating capillary
5
PEEK pressure screws, short
6.2744.070
6
Purge valve
7
Purge valve rotary knob
1 Connecting the purging needle
■
Push the end of the purging needle (20-3) over the end of the
deaerating capillary (20-4) on the purge valve.
2 Connecting the syringe
■
Insert syringe (20-1) in the Luer connector (20-2) of the purging
needle (see Figure 20, page 41).
3 Opening purge valve
■
Open the rotary knob (20-7) by approx.
½ rotation counterclock-
wise.