2 installing the peristaltic pump, Installing the peristaltic pump, Figure 25 – Metrohm 850 Professional IC Cation - Prep 2 User Manual

Page 55: Installing the pump tubing

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

2 Installation

850 Professional IC – Cation – Prep 2

■■■■■■■■

45

5

Tubing cartridges 6.2755.000

6

Contact pressure lever

7

Snap-action lever

2.14.2

Installing the peristaltic pump

6.2744.160

1

6.2744.180

2

3

4

5

6

7

8

1

9

10

3

6

7

8

Figure 25

Installing the pump tubing

1

PEEK pressure screws, short
(6.2744.070)

2

Tubing olive (6.2744.034)

3

Stopper
The colors of the stopper indicate the inner
diameter of the pump tubing.

4

Tubing cartridge (6.2755.000)

5

Contact pressure lever

6

Union nut

7

Adapter

8

Tubing olive
Either with filter holder (6.2744.180) or
without filter holder (6.2744.160).

9

Pump tubing (6.1826.xx0)

10 Snap-action lever

Mount the pump tubing as follows:

1 Removing the tubing cartridge

Release the tubing cartridge from the cartridge holder by pressing
the snap-action lever and unhooking from the mounting pins (24-1).

2 Connecting the aspiration side

Place a 6.2744.034 tubing olive (25-2) on the aspiration side of the
pump tubing.

Advertising