5 operation and maintenance, 1 operation, 2 maintenance – Metrohm Thin-Layer cell User Manual

Page 19: 1 replacing the working electrode, Operation, Maintenance, Replacing the working electrode

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

5 Operation and maintenance

IC Equipment Thin-Layer cell

■■■■■■■■

13

5 Operation and maintenance

5.1

Operation

The measuring cell is operated together with the detector and the entire
IC system with the MagIC Net™ software.

Additional information for operation with MagIC Net™ can be found in
the "Tutorial for MagIC Net™" or in the MagIC Net™ online help.

5.2

Maintenance

The measuring cell must be taken out of the detector for the following
maintenance tasks.

Caution

The electrode cables may not be unplugged unless the measuring cell is
switched off in the software!

Taking the measuring cell out of the detector

1 In the software, switch off the measuring cell.

2 Disconnect all three electrode cables.

3 On the measuring cell holder, push the Press switch and remove the

measuring cell from the holder.

5.2.1

Replacing the working electrode

Replacing the working electrode

Prerequisites:

The measuring cell is switched off.

The measuring cell has been removed from the detector.

The electrode cables are unplugged.

No tool is required for replacing the working electrode.

Advertising