3 replacing the spacer, Replacing the spacer – Metrohm Thin-Layer cell User Manual

Page 21

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

5 Operation and maintenance

IC Equipment Thin-Layer cell

■■■■■■■■

15

2 Unscrew the fastening screw for the reference electrode and remove

it.

3 Take out the reference electrode.

4 Insert the new reference electrode.

5 Retighten the fastening screw.

Note

Important: After an Ag/AgCl reference electrode has been
taken out!

The Ag/AgCl reference electrode may not be allowed to dry out. Follow
the directions for storage contained in the leaflet for the Ag/AgCl refer-
ence electrode.

5.2.3

Replacing the spacer

Depending on the application, the measuring cell can be operated with a
variety of different spacers. The different spacers are available as accesso-
ries (see Chapter 7, page 21).

The measuring cell must be disassembled in order to replace the spacer.
Proceed as follows to disassemble the measuring cell:

Disassembling the measuring cell

Prerequisites:

The measuring cell is switched off.

The measuring cell has been removed from the detector.

The electrode cables have been removed.

Advertising