Assembly, Pre-assembly, Tubes & flighting – Wheatheart WHR 130 x 31-36ft Augers PTO-SD User Manual

Page 15

Advertising
background image

WHEATHEART - GHR130 & WHR130 GRAIN AUGERS

3. A

SSEMBLY

PTO-SD & EMD D

RIVE

M

ODELS

3.1. P

RE

-A

SSEMBLY

16652 R1

15

3. Assembly

3.1. PRE-ASSEMBLY

Before beginning assembly, familiarize yourself with all the sub-assemblies and
hardware making up the auger. Have all parts on hand and arrange them for
easy access. Carry out assembly in a large open area with a level surface.

Important:

Always have 2 or more people assembling the equipment. Because of the

weight, do not attempt assembly alone.

Augers are available in various combinations. In most cases, the following
instructions will apply to all augers. Where the assembly information varies,
additional instructions will be included and will be indicated with an arrow.

3.2. TUBES & FLIGHTING

1. Position tube sections. Align tube sections on a flat surface or on a series of

benches.

Note:

When assembling more than 2 sections, start from spout end and work towards

hopper.

2. Slide lower flight shaft onto upper flight shaft until flight ends butt together

and flighting spiral matches up. Secure with two 5/8” x 4-1/2” grade 8 bolts
and locknuts (Figure 3.1). Repeat, if necessary, for any remaining flight
shafts.

Figure 3.1

Warning: Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.

WARNING

Do not drop. Damage to equipment or serious
personal injury will result.

Advertising
This manual is related to the following products: