Intake hitch, Pto sd - drive & shield – Wheatheart WHR 130 x 31-36ft Augers PTO-SD User Manual

Page 17

Advertising
background image

WHEATHEART - GHR130 & WHR130 GRAIN AUGERS

3. A

SSEMBLY

PTO-SD & EMD D

RIVE

M

ODELS

3.4. I

NTAKE

H

ITCH

16652 R1

17

3.4. INTAKE HITCH

1. Clean dirt and paint from

lower flight stub and intake
bushing.

2. Attach intake hitch to lower

auger tube and tighten
securely.

3. Maintain 1/2” (1.27 cm)

clearance between bushing
and end of flight.

4. Attach clevis to intake hitch

with clevis pin and grip clip.

3.5. PTO SD - DRIVE & SHIELD

See Figure 3.6.

Upper sections of the driveshaft are factory installed. To install the lower section
follow the steps below.

1. Check Table below for correct sequence for your auger.

2. Clean dirt and paint from driveshaft ends, inside couplers, and PTO driveline

yoke.

3. Remove chain from chain coupler on gearbox, then attach chain coupler

sprocket to driveshaft with a 1/4" x 1-1/2" square key. Tighten set screws.

4. Place

gearbox

assembly

on auger tube, then reinstall chain-to-chain coupler

leaving minimum of 1/16" (1.6 mm) between coupler sprockets.

5. Secure gearbox assembly to auger tube with two half bands and four

7/16" x 1-1/4" bolts and locknuts. Tighten securely.

Important:

Fill gearbox half full only with EP90 lube oil before operating auger. Do not over

fill. Failure to heed will void warranty. It is easier to fill oil into gearbox when in flat

position.

6. Attach the chain coupler guard to gearbox base with two 3/8" x 3/4" bolts and

washer locknuts (Figure 3.6).

Part

Size

Amt.

Intake Hitch

7/16” x 1-1/4” bolt and locknut

8

Clevis Pin

3/4”

1

Figure 3.5

AUGER MODEL

LOWER DRIVESHAFT

LENGTH

DIAMETER

13” x 31'

6' 4"

1-1/4"

13” x 36'

11' 8"

1-1/4"

Advertising
This manual is related to the following products: