Winch & lift cable – Wheatheart WHR 130 x 31-36ft Augers PTO-SD User Manual
Page 24
3. A
SSEMBLY
WHEATHEART - GHR130 & WHR130 GRAIN AUGERS
3.10. W
INCH
& L
IFT
C
ABLE
PTO-SD & EMD D
RIVE
M
ODELS
24
16652 R1
8. Attach upper lift arms to roller track shoe with one 3/4" x 6-1/2" bolt and
locknut. Do not over-tighten. Tighten snug only; this bolt acts as a pivot point
(Figure 3.14).
9. Lower upper end of auger slowly until the roller track shoe rests against the
track stop.
3.10. WINCH & LIFT CABLE
1. Attach cable to winch using one of the 2
methods shown, depending on supplied
winch.
• If method 2 is used, the nut must be on
the outside of the drum to prevent dam-
age to the cable. Leave about one inch
(2.54 cm) of cable extending past the
clamp. Cable must leave winch from
bottom side.
2. The winch must have a
minimum of 3 wraps of cable
on drum when auger is in
transport position.
3. Attach winch to winch mount
with three 3/8” washer
locknuts.
Winch handle must be
positioned on the left side of the
auger (determine left by
standing at the intake end,
facing the discharge end).
4. Thread lift cable under and around roller on track shoe, then back to cable
attach rod welded to lower end of track.
Figure 3.14
Figure 3.13
Figure 3.15
Important: