Discharge spout, Transport undercarriage – Wheatheart WHR 130 x 31-36ft Augers PTO-SD User Manual
Page 22
3. A
SSEMBLY
WHEATHEART - GHR130 & WHR130 GRAIN AUGERS
3.8. D
ISCHARGE
S
POUT
PTO-SD & EMD D
RIVE
M
ODELS
22
16652 R1
3.8. DISCHARGE SPOUT
1. Attach
discharge spout with two
7/16" x 1-1/4" bolts and locknuts
(Figure 3.10).
3.9. TRANSPORT UNDERCARRIAGE
1. To
assemble
undercarriage, fasten the lower reach arms to axle with three
7/16" x 1-1/4" bolts and locknuts on each side.
2. Attach
long
crossmember to bottom of undercarriage brackets as shown,
with two 7/16" x 1-1/4" bolts and locknuts.
3. Attach the short crossmember to lower reach arms with two 1/2” x 1-1/4"
bolts and locknuts.
Figure 3.11
4. Wheel hub assembly:
a. Remove any dirt or paint from spindle and hub.
b. Thoroughly pack wheel bearings and cups with a good grade of bearing
grease.
c. Place large bearing into hub and carefully tap in seal.
d. Slip hub onto spindle and insert small bearing.
Figure 3.10
7/16” X 1-1/4” BOLT
AND LOCKNUT