Discharge spout, Transport undercarriage – Wheatheart WHR 130 x 31-36ft Augers PTO-SD User Manual

Page 22

Advertising
background image

3. A

SSEMBLY

WHEATHEART - GHR130 & WHR130 GRAIN AUGERS

3.8. D

ISCHARGE

S

POUT

PTO-SD & EMD D

RIVE

M

ODELS

22

16652 R1

3.8. DISCHARGE SPOUT

1. Attach

discharge spout with two

7/16" x 1-1/4" bolts and locknuts
(Figure 3.10).

3.9. TRANSPORT UNDERCARRIAGE

See Figure 3.11 to 3.15.

1. To

assemble

undercarriage, fasten the lower reach arms to axle with three

7/16" x 1-1/4" bolts and locknuts on each side.

2. Attach

long

crossmember to bottom of undercarriage brackets as shown,

with two 7/16" x 1-1/4" bolts and locknuts.

3. Attach the short crossmember to lower reach arms with two 1/2” x 1-1/4"

bolts and locknuts.

Figure 3.11

4. Wheel hub assembly:

a. Remove any dirt or paint from spindle and hub.

b. Thoroughly pack wheel bearings and cups with a good grade of bearing

grease.

c. Place large bearing into hub and carefully tap in seal.

d. Slip hub onto spindle and insert small bearing.

Figure 3.10

7/16” X 1-1/4” BOLT
AND LOCKNUT

Advertising
This manual is related to the following products: