Operation, Auger drive & lockout procedure – Wheatheart WHR 130 x 31-36ft Augers PTO-SD User Manual

Page 33

Advertising
background image

WHEATHEART - GHR130 & WHR130 GRAIN AUGERS

5. O

PERATION

PTO-SD & EMD D

RIVE

M

ODELS

5.1. A

UGER

D

RIVE

& L

OCKOUT

P

ROCEDURE

16652 R1

33

5. Operation

Operators must observe safety procedures at all times and follow the pre-opera-
tional checklist before each start-up.

Pre-Operational Checklist

Before operating auger each time, the operator must confirm the following:

• All fasteners are secure as per assembly instructions.

PTO SD Models:

• Driveline is connected and secure.
• Driveline shield rotates freely.

• EMD Models:

• Drive belt(s) are not frayed or damaged.
• Drive belt(s) are properly adjusted and aligned.

• Lift cable is not frayed or damaged.
• Lift cable is properly seated in cable sheaves.
• Cable clamps are secure.
• Tube alignment is reasonably straight.
• Auger wheels are chocked, and

PTO SD Models: tractor wheels are chocked or the parking brake has been

engaged.

• Intake area and discharge spout are free of obstructions.
• Proper maintenance has been performed.

5.1. AUGER DRIVE & LOCKOUT PROCEDURE

Warning: Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.

Drive

Type

Before Operation

Lockout

Electric

Motor

Before starting motor, ensure

• motor is properly grounded
• pulley shields are in place and secure

The electric motor should be
equipped with a main power
disconnect switch capable of being
locked in the off-position only. The
switch should be in the locked
position during shutdown or
whenever maintenance is performed
on the auger.

• If reset is required, disconnect all

power before resetting motor.

Advertising
This manual is related to the following products: