Assigning Programs to the FlowStation

1. On the BaseStation 3200 irrigation controller, turn the dial to the Flow position.

2. Press the Next button to highlight the Assign Programs to Mainlines option.

3. Press the Enter button. The Progs to Mainline

screen displays.

4. In the Program column, press the + or

button to select the program that you want to

assign to the FlowStation.

5. Press the Next button to move to the

Mainline column.

6. Press the + or button to display FlowStn in

the Mainline column.

Assigning Booster Pumps to the FlowStation

Note: The pump device that you want to assign to the FlowStation must be assigned to a master

valve slot in the BaseStation 3200 before you can assign it to the FlowStation. Refer to Searching

for and Assigning Pump Start Devices and Master Valves in the BaseStation 3200 User Manual.

1. On the BaseStation 3200 irrigation controller, turn the dial to the Water Sources position.

2. Press the Next button to highlight the

Booster Pumps Program Setup option.

3. Press the Enter button. The Booster Pumps

screen displays.

4. In the Decoder field, press the + or button

to display the master valve slot where the

booster pump device is assigned. The serial

number of the device displays next to the

field.

5. In the Use As Booster Pump field, press the +

button until FlowStn displays.