Viewing additional controller status details, Viewing the program status report – Baseline Systems FlowStation User Manual

Page 35

Advertising
background image

Baseline FlowStation User Manual

Viewing Additional Controller Status Details

1. Display the Controller Status Report as described in the Viewing the Controller Status Report

topic above.

2. Press the  button. The Controller Status details for the first controller display.

Controller – Shows the sequential

number of the controller based on the

slot in which this controller is assigned

on the FlowStation

Status – Shows the status of the

connection between this controller and

the FlowStation

Serial Number – Shows the serial

number of this controller

MAC – Shows the MAC address of this controller
Note: The next two fields alternate between showing the requested and the assigned

amounts.

Requested/Assigned Flow – Shows the amount of flow that this controller has

requested/assigned for its running programs

Requested/Assigned Concurrent – Shows the number of concurrent zones that this

controller has requested or has been assigned to run
Note: The “Friendly Name” assigned to this controller in BaseManager displays at the

bottom of the Controller Status Detail screen. If the BaseStation 3200 controllers in the

shared flow group are connected to BaseManager, Baseline recommends that you

assign a friendly name to each controller so your controllers are easier to identify.

3. To view the Controller Status details for the next controller, press the  button.

4. To return to the Status Report menu, press the BACK button.

Viewing the Program Status Report

1. Press the RUN button.

2. Press the BACK button. The Status Report

menu displays.

3. Press the  or  button to highlight Program

Status, and then press the OK button. The

Program Status screen for the first controller

displays. The controller’s serial number

displays at the top of the screen.

4. To view the status for the programs on another controller, press the + button.

5. To return to the Status Report menu, press the BACK button.

4 – Configuring the FlowStation

Page 31

Advertising