Setting the fill time for a mainline, Setting up shared flow programs – Baseline Systems FlowStation User Manual

Page 23

Advertising
background image

Baseline FlowStation User Manual

Setting the Fill Time for a Mainline

1. On the FlowStation, press the Flow Setup button. The Flow Setup screen displays.

2. Press the  button to highlight the Main Line Setup option, and then press the OK button to

select it. The Main Line Setup screen displays.

3. Press the  button to highlight the mainline that you want to set the fill time for, and then

press the OK button to select it. The Main

Line # screen displays.

6. Press the  button to highlight the Fill Time

option, and then press the OK button to

select it. The Fill Time screen for the mainline

displays.

7. Press the + button to change the time in the

Fill Time field.

Setting Up Shared Flow Programs

The user selects which programs must get their water from the FlowStation.

Note: Refer to Assigning Programs to the FlowStation on page 9.

1. On the FlowStation, press the Program Setup button. The Program Setup screen displays the

list of the BaseStation 3200 controllers that have been assigned to the FlowStation.

2. Press the  or  button to highlight the

controller that has the program that you

want to set up, and then press the OK button.

The Program Setup screen displays.

3. Press the PRG button on the display panel to

select the program that you want to work

with. The controller number and program

number display in the upper-left corner of the

screen.

Example: Cn 1, Pr 1 = Controller 1 and Program 1

4. In the Priority field, press the + or button to change the priority for this program.

The priority settings are 1 through 10 where 1 (the default setting) is the highest priority. The

priority setting on the FlowStation controls how water is allocated to controllers and

programs, and the program priority setting on the BaseStation 3200 manages the sequence

for program starts. The priority setting on the FlowStation takes precedence over the setting

on the controller, so a program that has high priority in the controller might be scheduled to

start, but if it has low priority in the FlowStation, it might not be allocated the water that it

needs to run.

Note: For most shared flow scenarios, we recommend that you leave the Priority for all

programs set to the default (1) on the FlowStation.

4 – Configuring the FlowStation

Page 19

Advertising