Apply Power and Verify Operation

Apply Power and Verify Operation

1. Apply –48 VDC power to Access Navigator and verify the following front panel status indications

(see Figure 6-26).

Requirement:

CONTROLLER A POWER indicator lights green.

Requirement:

CONTROLLER A ACTIVE indicator lights green.

2. If second (redundant) controller is present, verify the following front panel status indications.

Requirement:

CONTROLLER B POWER indicator lights green.

Requirement:

CONTROLLER B ACTIVE indicator is off.

NOTE:

If power indicators do not light, check power connections (see DC Power

Connections on

page 6-35

).

Figure 6-26. Location of Front Panel Power-On Status LEDs